Before-and-after evaluation
A before-and-after evaluation measures whether a junction scheme, speed measure or signs and markings scheme has actually worked on the ground. It shows the authority which measures are worth repeating and enables it to report the outcome of its investment on an evidence basis.
Why it matters
A fall in crashes after a measure does not always mean the measure has succeeded. At locations selected as black spots, crashes tend to fall naturally in the following period even if nothing is done; this is known as regression to the mean. General traffic growth or changes in how crashes are reported can also distort the results.
For this reason, rather than a simple comparison, we prefer statistical methods that use a comparison group or that correct for these effects, such as the empirical Bayes method. Where crash numbers are low, we support the result with intermediate indicators such as speed surveys and video-based conflict analysis. This provides reliable data for the continuous learning cycle that the Safe System approach requires.
How we work
- 1
Evaluation design
We define the measure, the indicators to be measured, the comparison sites and the before and after periods.
- 2
Before data
We compile, or measure on site, crash, speed and, where needed, conflict data from before implementation.
- 3
After data
Once the measure has bedded in, we repeat the measurements using the same method.
- 4
Statistical analysis
We calculate the true effect of the measure, correcting for regression to the mean and general trends.
- 5
Results report
We present the effect, its confidence interval and the cost-benefit outcome of the investment in plain language.
What you receive
- Before-and-after evaluation report
- Comparison tables of crash, speed and conflict indicators
- Explanation of the statistical method and assumptions
- Cost-benefit assessment
- Recommendations for similar schemes
Who it is for
- Municipalities seeking to measure the results of road safety investments
- Road authorities reporting on their programmes of measures
- Organisations with monitoring obligations on grant- or loan-funded projects
- Managers deciding whether to roll out pilot schemes
Frequently asked questions
How long do we need to wait for a result?
A reliable result based on crash data usually requires several years of data after implementation. With speed and conflict measurements, we can carry out an initial evaluation much sooner.
Can the analysis be done if no before data was collected?
Crash records can be used retrospectively. However, if there are no before values for measurements such as speed or conflicts, only a limited evaluation using comparison sites is possible; we therefore recommend planning measurements before implementation begins.
Other services in this area
Let's assess road and traffic safety together.
Share a traffic safety problem with us, whether at a school frontage, a junction or across a road network. We will assess the available data and draw up a site visit and data collection plan.
AddressGüzelyalı Mah. 81181 Sk.Fazilet Kibritoğlu Apt.
No: 1, İç Kapı No: 01
Çukurova / Adana
Open in maps