Temporary traffic management

Temporary traffic management is the plan that allows traffic to pass a works area safely during roadworks or maintenance and repairs. We prepare the signing, lane closure and diversion arrangements according to the duration of the works, the type of road and traffic conditions.

Ask us about this service

Over-height warning gantry in front of a bridge detecting a tall lorry

Why it matters

Works areas are places where the road layout drivers are used to changes suddenly. Closures noticed too late, short transition lengths and conflicting signs create serious risks for both drivers and the teams working on site. A planned layout warns drivers early, reduces speeds gradually and guides traffic away from the works area along a clear line.

The plan consists of advance warning, transition, buffer, work and termination zones. The length of each zone is determined by the speed of the road, and the layout of signs, cones, barriers, flashing lights and, where needed, arrow boards or variable message signs is shown. Night working, phased works, pedestrian and cycle routes and alternative diversions are planned separately, and implementation is checked on site.

How we work

  1. 1

    Works programme review

    We establish the location, duration and phases of the works and the plant to be used.

  2. 2

    Traffic assessment

    We calculate volumes, speeds and capacity loss to determine closure and diversion options.

  3. 3

    Plan preparation

    We prepare signing, lane closure and diversion drawings for each phase.

  4. 4

    Implementation checks

    We check on site, by day and by night, that the set-up complies with the plan.

  5. 5

    Plan revision

    We revise the plan as the works progress and as problems are identified on site.

What you receive

  • Phased temporary traffic management plans
  • Signing and equipment quantities
  • Alternative route and diversion plan
  • Site check reports

Who it is for

  • Municipalities and organisations carrying out infrastructure works
  • Road, water, natural gas and fibre infrastructure contractors
  • Road authorities running maintenance and repair programmes
  • Large construction sites

Frequently asked questions

All services

Is a plan needed for short-duration works too?

Yes. Short-duration and mobile works pose similar risks to traffic. We can prepare reusable standard plans for this type of work.

What needs particular attention for night works?

It is important to use retroreflective equipment and illuminated warning devices, and to ensure that works area lighting does not dazzle drivers. We prepare a separate layout and checklist for night-time working.

Let's assess road and traffic safety together.

Share a traffic safety problem with us, whether at a school frontage, a junction or across a road network. We will assess the available data and draw up a site visit and data collection plan.

AddressGüzelyalı Mah. 81181 Sk.
Fazilet Kibritoğlu Apt.
No: 1, İç Kapı No: 01
Çukurova / Adana
Open in maps