Traffic impact assessments
A traffic impact assessment is an engineering study that calculates in advance the additional load a new building or facility will place on the surrounding road network. We show the investor and the approving authority clearly under what conditions, and with which measures, the development can open without gridlocking traffic.
Why it matters
When a large shopping centre, hospital or housing estate opens, problems usually appear in the first few days: entry queues spill back onto the main road, junctions lock up at peak hours and pedestrians start crossing at unsafe points. Identifying these problems while the project is still on paper avoids expensive and contentious fixes later.
We build the study around baseline, opening-year and future-year scenarios. We assess junction and link capacities, delays and queue lengths using the Highway Capacity Manual (HCM) level of service concept; we treat not only capacity but also conflicts at access points and pedestrian and cyclist safety as part of the analysis.
How we work
- 1
Defining the study area
Together with the authority, we define the junctions, road sections and analysis hours to be examined.
- 2
Baseline counts
We measure today's load at peak hours through directional traffic counts, pedestrian counts and queue observations.
- 3
Trip generation and distribution
We calculate the trips the development will generate based on its land use and size, distribute them by direction and assign them to the network.
- 4
Scenario and capacity analysis
We compare with-development and without-development conditions for the opening and future years, calculating level of service and queues.
- 5
Package of measures and report
We report measures for access geometry, lane layout, traffic signals and pedestrian crossings, together with their effects.
What you receive
- Traffic impact assessment report
- Count data and summary tables
- Trip generation and assignment calculations
- Level of service and queue results by junction
- Site layout plan of the proposed measures
- Responses to authority comments and revision support
Who it is for
- Investors in shopping centres, hospitals and education campuses
- Developers of housing and mixed-use schemes
- Logistics and industrial facilities
- Municipalities running permit and zoning processes
Frequently asked questions
At what stage should a traffic impact assessment be carried out?
The most effective time is the preliminary design stage, while the site layout and access points can still be changed. At this stage, the recommended measures can be built into the scheme at low cost.
Which future years are considered in the analysis?
Usually the development's opening year and a long-term design year required by the relevant authority are examined. When forecasting background traffic growth, we also take into account other approved developments in the area.
Other services in this area
Let's assess road and traffic safety together.
Share a traffic safety problem with us, whether at a school frontage, a junction or across a road network. We will assess the available data and draw up a site visit and data collection plan.